Theoretical yearly savings OSL:

0 liters of water
0 kg CO2
0 kg glycol
0 kg jet fuel

P#01

***

PROJECT OSL

#P-O01 Preliminary Project

INITIALIZING . . /////////////////////////////////////////////////////////////////// 100% COMPLETE

Stage 1: Airport analysis

  • Technical infrastructure
  • Use of the current areas
  • Long-term development and incorporation in the airport master plan
  • Aircraft operations
  • Planned usage of MSG’s system
  • Project execution

Stage 2: Location analysis

  • Design criteria
  • Use of existing de-icing areas and structures
  • Traffic simulation that ensures good traffic flow
  • Considerations from ARFF, ATC and other relevant airport parties
  • Radio technical considerations and interference
  • Winter vs. summer operations
  • Design and geometry of taxiway connections and markings
  • Ground conditions and substructures
  • Structure turbulence considerations
  • Mapping of existing ground conditions with regards to pollution and any prior environmental impact
  • Mass deposition requirements
  • Fluid facilities including water management and de-icing chemical handling infrastructure
  • Electrical infrastructure
  • Project execution plan
  • Cost calculations

Stage 3: Other operational criteria

  • Traffic congestion/taxiway additions and/or infrastructure
  • Distance from turns and alignment with taxiway centerlines
  • Jet blast direction
  • Size of area effected by chemicals/glycol run off after de-ice/wash
  • Snow removal trucks and ground traffic
  • Movement vs non-movement areas
  • Radio communications and procedures

#P-O02 CONSTRUCTION

INITIALIZING . . . . . //////////////////// 10%

STARTED Q2 2023

Phases

Phase 1: Area cleanup

  • Technical infrastructure
  • Use of the current areas
  • Long-term development and incorporation in the airport master plan
  • Aircraft operations
  • Planned usage of MSG’s system
  • Project execution

Phase 2: Ground work

  • Technical infrastructure
  • Use of the current areas
  • Long-term development and incorporation in the airport master plan
  • Aircraft operations
  • Planned usage of MSG’s system
  • Project execution

Phase 3: Technical installation

  • Technical infrastructure
  • Use of the current areas
  • Long-term development and incorporation in the airport master plan
  • Aircraft operations
  • Planned usage of MSG’s system
  • Project execution

Phase 3: Technical installation

  • Technical infrastructure
  • Use of the current areas
  • Long-term development and incorporation in the airport master plan
  • Aircraft operations
  • Planned usage of MSG’s system
  • Project execution

#P-O03 SYSTEMS INTEGRATION

INITIALIZING . . . . . . . . ESTIMATED Q2 2024

#P-O04 START COMMERCIAL PHASE

INITIALIZING . . . . . . . . . ESTIMATED Q3 2024